
INSIDE BENBAO
A closer look. From the factory floor.
Explore electric scooter and motorcycle assembly at BENBAO: the people, production stages and quality checks behind your next order.
Our vehicle assembly facilities
Four stages of quality control
Final inspection of every completed vehicle
01 / Our role
What we manufacture. How we work.
A clear view of the production responsibilities behind a BENBAO vehicle.

Inside BENBAO
Our own factories handle subassembly, frame assembly, final vehicle assembly and whole-vehicle inspection. We coordinate the approved vehicle configuration and quality control throughout assembly.
Working with component suppliers
Core components are sourced from suppliers to the agreed configuration. Frame welding, including robotic welding where used, is performed by suppliers; it is not an in-house BENBAO welding operation.
02 / Assembly
An assembly process you can follow.
From the agreed configuration to the completed vehicle, each stage has a place in the production workflow.

- 01
Confirm the configuration
Agree the model, components and order requirements before production.
- 02
Receive components
Incoming inspection is the first quality-control stage.
- 03
Build the vehicle
Subassembly and frame assembly feed into the final assembly line.
- 04
Check during production
In-process inspections and routine production-line checks take place during assembly.
- 05
Inspect before release
Every completed vehicle receives final inspection.



03 / Quality control
Quality Control Throughout Assembly
Incoming inspection, in-process inspection, routine production-line checks and final inspection form our four-stage QC process. Every completed vehicle is inspected before release.
- 01
Incoming inspection
Checks at component receipt.
- 02
In-process inspection
Checks during assembly operations.
- 03
Production-line checks
Checks along the production line.
- 04
Final inspection
Checks on every completed vehicle.






Inspection scope matters. For a specific order, discuss the applicable checks, test conditions and records with our team. Final inspection of every vehicle does not mean every specialist test is performed on every unit.
04 / Packing
Plan the packing around your order.
The vehicle configuration, shipment format and work to be completed at destination all affect the packing plan. Confirm them together before shipment.


From the warehouse to loading
Our warehouse and loading photos show different stages of shipment preparation. The final packing method and loading quantity are agreed for the specific model and order.
| Format | Work at destination | Confirm for your order |
|---|---|---|
| CBU | Vehicle supplied assembled; any transport-related refitting follows the agreed packing plan. | Vehicle dimensions, battery shipment arrangement and packing protection. |
| SKD | Selected assemblies are completed locally. | Disassembly list, assembly instructions, tools and inspection responsibilities. |
| CKD | More extensive local assembly is required. | Parts list, local assembly capability, tooling and quality-control plan. |
Availability and the exact CBU, SKD or CKD scope depend on the model and project. Container quantities and import treatment require order- and destination-specific confirmation.
Read the CKD / SKD buyer guide05 / Visit us
See the process for yourself.
Discuss an on-site visit, video tour, third-party factory audit or pre-shipment inspection with our team.
- 1
Tell us what you need to review
Share your target models, project stage and preferred visit format.
- 2
Agree the scope and timing
For on-site visits, normally allow about one week to coordinate the schedule.
- 3
Review the relevant operations
Agree the production areas, documents and inspection arrangements in advance.

Main base · No. 5111, Shugang Avenue, Jinqing, Luqiao, Taizhou, Zhejiang, China
Take the next step with the right information.
Practical guides for evaluating a manufacturer and planning your project.
Assess a manufacturer
What to review when choosing an electric motorcycle manufacturing partner.
Read guide02Prepare shipment documents
Coordinate vehicle, battery and shipping paperwork for your destination.
Read guide03Plan an OEM/ODM Project
Understand branding, configuration changes and development discussions.
Read guideQuestions before you order.
Does BENBAO manufacture every component?
No. BENBAO operates its own whole-vehicle assembly facilities and controls assembly and QC. Core components come from suppliers; frame welding is performed by suppliers.
Is every completed vehicle inspected?
Yes. Every completed vehicle receives final inspection before release. The scope and frequency of specialist tests should be confirmed separately for the relevant model and order.
Can we appoint a third-party inspector?
Yes. Third-party factory audits and pre-shipment inspections can be arranged. Please agree the scope, timing and access requirements with our team beforehand.
Can we review test records or certificates?
Tell us the model, destination market and document you need. Our team will confirm which records or certificates apply and what can be shared for your project.
How many vehicles fit in a container?
The quantity depends on the model, configuration, packing dimensions and shipment format. Request a loading plan for your specific order rather than relying on a single factory-wide figure.
Discuss Your Factory Visit or Order
Review the factory, production process or inspection arrangements.
Arrange a factory visitShare the models, destination and quantity you have in mind.
Discuss your order